MOSAIC is entering its final phase !

The prototype at Cener facilities in Sangüesa is on its way towards its final state, as depicted in this video created by Increscendo:

Here is a brief overview of the last works carried out on the construction site:  

  • The mounting towers for the mobile elements and the oven have been erected.
  • The mechanical, optical and electrical elements of the tracking system have been installed and are being tested.
  • The innovative dummy hoses have been connected to the receiver.
  • The meteorological station has been connected to the tracking system, and the DCS of the whole prototype has been updated to achieve a full control of the plant.

The next key step will be the installation of the field of the solar mirrors, along with the evaluation of a watering system for the mirrors.

For more information about the tracking system, have a look at the latest news by Tekniker.